Analyzed statement

What Romeu Zema said about recover and invest in power transmission and distribution infrastructure in Minas Gerais

Romeu Zema

Romeu Zema

February 3, 2026

View profile →

For

About: recover and invest in power transmission and distribution infrastructure in Minas Gerais

Romeu Zema: So, it was a political project.

Romeu Zema: And with that, you know what happened?

Besides CEMIG having that accounting loss of over 12 billion on the books, there was also the deterioration of the entire transmission and distribution infrastructure in Minas.

Romeu Zema · 19:46

Romeu Zema: When I ran my campaign in 2018, Bruno and Malu, what I saw most... When I arrived in a town, there was a rural producer saying, 'oh, my center pivot is stopped, it's been four years, why don't I get power?'

Romeu Zema: 'Oh, my factory — I had to buy a generator, I expanded production and Semig doesn't deliver power to me.'

Why it was classified this way · 90% confidence

Denounces the dilapidation of infrastructure and implies the need for rehabilitation.

Excerpt from a public video, transcribed and classified by AI. See the Methodology